₹1,50,000 – ₹5,00,000+ for a complete factory move depending on size and distance

Factory Relocation Services in Bangalore

A factory relocation is not simply a large machinery shifting job. It is a production-continuity project with financial stakes on every hour of downtime. We have relocated manufacturing units across Peenya, Bommasandra, Whitefield, and the Hosur Road corridor—plants with 8 to 30 machines, production lines still partially running during the move, and windows of 48 hours to complete a transfer before the next production cycle starts. Our role is project management as much as physical shifting. We coordinate the crane crew, transport fleet, dismantling team, and destination site prep as a single operation so that you are not managing five separate contractors on your phone.

What's Included

  • Full project management from survey to production restart
  • Phased relocation to keep part of production running during the move
  • Machine dismantling, labelling, and systematic packing
  • Production line documentation (photos, cable labels, pipe tags)
  • Multi-crane operations for large floor areas
  • Coordination of transport fleet and crane timing
  • Machine positioning, leveling, and installation support at new site

Equipment We Use

Hydra cranes (multiple units)Mobile cranesLow-bed trailers and covered trucksHydraulic jacks and roller systemsHeavy-duty wooden cratingIndustrial packing and wrapping materials

Common On-Site Challenges We Handle

  • Destination site not ready (pending civil work, utilities not energized) causing costly holds
  • Machines with no dismantling documentation from the original OEM installation
  • Unforeseen weight concentrations on the origin site floor when multiple cranes operate simultaneously

How We Work — Step by Step

01

Pre-Move Survey

We survey both sites. At the origin, we catalogue every machine, note its weight, dimensions, and current utilities. At the destination, we plan the final layout, identify crane access points, and flag any site prep needed before the move.

02

Move Plan & Schedule

We produce a machine-by-machine relocation schedule with day-by-day tasks. This covers which machines move first (usually largest and least critical), crane deployment slots, transport runs, and target completion milestones.

03

Dismantling & Documentation

Every machine is photographed before disassembly. Electrical wiring, pneumatic connections, and hydraulic lines are labelled systematically. Components are numbered and packed so reinstallation is straightforward.

04

Loading & Transport

Machines are crane-loaded onto transport vehicles in the planned sequence. Oversized or heavy machines travel on low-bed trailers with route permits as required.

05

Unloading & Positioning

At the destination, machines are unloaded and positioned according to the final floor plan. We use precision leveling instruments to confirm every machine meets tolerance before the leveling bolts are tightened.

06

Reconnection & Commissioning Support

Utilities are reconnected and labelled. We coordinate with electrical contractors and OEM service engineers for final commissioning so your plant resumes production on schedule.

Factory Relocation Services — FAQs

How long does a complete factory relocation take in Bangalore? +

A small factory with 5–8 machines typically takes 2–3 days if both sites are within 20 km. A mid-size plant with 15–25 machines usually requires 5–7 days for a structured phased move. The biggest time variables are site access at the destination (crane entry, floor readiness, utility connection timing) and whether any machines require OEM service for dismantling or alignment. We give you a realistic timeline during the site survey—not an optimistic one.

Can you relocate a factory while it is partially operational? +

Yes, and we do this regularly. Phased relocation means we move machines in batches, starting with the least critical or currently idle equipment. The production team keeps the remaining machines running while we clear, transport, and install the first batch. This requires careful coordination between our schedule and your production plan, but it is often the only option for businesses that cannot afford a full shutdown.

What documentation do you provide during a factory relocation? +

We provide pre-move photographs of every machine (general position, cable connections, reference dimensions), a numbered inventory of all machines and major components, a transport manifest for each truck run, and a post-move installation checklist. For machines with complex wiring, we use colour-coded cable tags that match a wiring diagram we photograph before disconnection. This documentation significantly reduces the time and risk during reconnection.

What does factory relocation cost in Bangalore? +

Factory relocation pricing depends on the number of machines, their weights, the distance between sites, and the access conditions at both locations. A 10-machine factory move within 20 km in Bangalore typically ranges from ₹1.5 lakh to ₹3 lakh. This includes crane hire, transport, manpower, and packing. We provide a written itemised quote after the site survey—generic phone estimates without a site visit are usually inaccurate.